SCHEDULING CONSTRUCTION PROJECTS WITH RESOURCES ACCESSIBILITY LIMITED AND CHANGEABLE IN TIME
نویسندگان
چکیده
منابع مشابه
Project selection with limited resources in data envelopment analysis
In this paper allocating a fixed resource for producing finite projects in order to obtaining a desired level of efficiency will be discussed. Note that it is assumed that a vector of limited sources is at hand. This vector of resources can be contained human resource, budget, equipment, and facilities. In any firm there exist different suggestions from subunits for running...
متن کاملA Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs
This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...
متن کاملFuzzy Scheduling of Repetitive Construction Projects
Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...
متن کاملScheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources
We address a dynamic repair shop scheduling problem in the context of military aircraft fleet management where the goal is to maintain a full complement of aircraft over the longterm. A number of flights, each with a requirement for a specific number and type of aircraft, are already scheduled over a long horizon. We need to assign aircraft to flights and schedule repair activities while consid...
متن کاملFlexible Heuristics for Project Scheduling with Limited Resources
Resource-constrained project scheduling is an NPhard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed imme...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
سال: 2004
ISSN: 1392-3730,1822-3605
DOI: 10.3846/13923730.2004.9636319