Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
نویسندگان
چکیده
منابع مشابه
Fuzzy Scheduling of Repetitive Construction Projects
Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...
متن کاملFine-Grain Scheduling under Resource Constraints
Many present-day microprocessors have ne grain parallelism, be it in the form of a pipeline, of multiple functional units, or replicated processors. The eecient use of such architectures depends on the capability of the compiler to schedule the execution of the object code in such a way that most of the available hardware is in use while avoiding so-called dependences. In the case of one simple...
متن کاملDynamic transport scheduling under multiple resource constraints
This paper presents a heuristic for the dynamic vehicle scheduling problem with multiple resource capacity constraints. In the envisaged application, an automated transport system using Automated Guided Vehicles, bottleneck resources are (1) vehicles, (2) docks for loading/unloading, (3) vehicle parking places, and (4) load storage space. This problem is hard, because interrelated activities (l...
متن کاملManaging a Portfolio of Product Development Projects under Resource Constraints
Managers of product development (PD) project portfolios face difficult decisions in allocating limited resources to minimize project or portfolio delay. Although PD projects are highly iterative (cyclical), almost all of the vast literature on project scheduling assumes that projects are acyclical. This article addresses this gap with a comprehensive analysis of 31 priority rules (PRs) on 18,48...
متن کاملScheduling Repetitive Construction Projects Using Fuzzy Linear Programming
Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: MATEC Web of Conferences
سال: 2018
ISSN: 2261-236X
DOI: 10.1051/matecconf/201819604045