Scheduling and order acceptance for the customised stochastic lot scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling and Order Acceptance for the Customized Stochastic Lot Scheduling Problem

This paper develops and analyzes several customer order acceptance policies to achieve high bottleneck utilization for the customized stochastic lot scheduling problem (CSLSP) with large setups and strict order due dates. To compare the policies simulation is used as main tool, due to the complicated nature of the problem. Also approximate upper and lower bound for the utilization are provided....

متن کامل

Simulation Optimization for the Stochastic Economic Lot Scheduling Problem

We study simulation optimization methods for the stochastic economic lot scheduling problem. In contrast to prior research, we focus on methods that treat this problem as a black box. Based on a large-scale numerical study, we compare approximate dynamic programming with a global search for parameters of simple control policies. We propose two value function approximation schemes based on linea...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

The stochastic economic lot scheduling problem: A survey

We consider the production of multiple standardized products on a single machine with limited capacity and set-up times under random demands and random production times, i.e., the so-called stochastic economic lot scheduling problem (SELSP). The main task for the production manager in this setting is the construction of a production plan for the machine that minimizes the total costs, i.e., the...

متن کامل

A Fuzzy Mathematical Model for Order Acceptance and Scheduling Problem

The problem of Order Acceptance and Scheduling (OAS) is defined as a joint decision of which orders to accept for processing and how to schedule them. Any linear programming model representing real-world situation involves the parameters defined by the decision maker in an uncertain way or by means of language statement. Fuzzy data can be used to incorporate vagueness in the real-life situation...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2009

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540802448882