Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Scheduling a variant of flowshop problems to minimize total tardiness

This paper studies no-wait flowshop scheduling problems to minimize total tardiness. This paper mathematically formulates the problem as an effective mixed integer linear programming model. Moreover, this paper proposes solution methods based on variable neighborhood search and simulated annealing algorithms. Besides, some well-known heuristics of classical flow shops are adapted to the case of...

متن کامل

Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints

Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for chromatographic analyses. The testing process requires long setup times and operators are needed to launch the process. The various controls are non-preemptive and are ...

متن کامل

Scheduling preemptive open shops to minimize total tardiness

This article considers the problem of scheduling preemptive open shops to minimize total tardiness. The problem is known to be NP-hard. An efficient constructive heuristic is developed for solving large-sized problems. A branch-and-bound algorithm that incorporates a lower bound scheme based on the solution of an assignment problem as well as various dominance rules are presented for solving me...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Industrial Engineering Computations

سال: 2015

ISSN: 1923-2926,1923-2934

DOI: 10.5267/j.ijiec.2015.1.002