Schedule Risk Analysis of ICT Infrastructure Projects
نویسندگان
چکیده
منابع مشابه
Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis
Background Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considere...
متن کاملSchedule Multiple Highway Construction Projects
The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.
متن کاملAnts Can Schedule Software Projects
This paper presents the design of an algorithm based on Ant Colony Optimization paradigm to solve the Software Project Scheduling Problem. This problem consists in deciding who does what during the software project development, finding an optimal schedule for a project so that the precedence and resource constraints are satisfied and the final project cost and its duration are minimized. We pre...
متن کاملA COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION
<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computer Applications
سال: 2012
ISSN: 0975-8887
DOI: 10.5120/4601-6803