Schedule-Allocate and Robust Sequencing in Three-Machine Robotic Cell under Breakdowns

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-machine robotic cell considering different loading and unloading times

In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a go...

متن کامل

Part sequencing in three-machine no-wait robotic cells

A no-wait robotic cell is an automated ow shop in which a robot is used to move the parts from a machine to the next. Parts are not allowed to wait. We analyze the complexity of the part sequencing problem in a robotic cell with three machines, for di erent periodical patterns of robot moves, when the objective is productivity maximization. c © 2000 Elsevier Science B.V. All rights reserved.

متن کامل

Stochastic Production Planning under Random Machine Breakdowns

In this paper, we consider a multi-period, multi-product production planning problem where the production rate and the customer service level are random variables due to machine breakdowns. In order to determine robust production plans, constraints are introduced in the stochastic capacitated lot-sizing problem to ensure that a prespecified customer service level is met with high probability. T...

متن کامل

Scheduling in a three-machine robotic flexible manufacturing cell

In this study, we consider a flexible manufacturing cell (FMC) processing identical parts on which the loading and unloading of machines are made by a robot. The machines used in FMCs are predominantly CNC machines and these machines are flexible enough for performing several operations provided that the required tools are stored in their tool magazines. Traditional research in this area consid...

متن کامل

two-machine robotic cell considering different loading and unloading times

in this paper, the researchers have investigated a concatenated robot move (crm) sequence problem and minimal part set (mps) schedule problem with different setup times for two-machine robotic cell. they have focused on simultaneous solving of crm sequence and mps schedule problems with different loading and unloading times. they have applied a simulated annealing (sa) algorithm to provide a go...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2020

ISSN: 1563-5147,1024-123X

DOI: 10.1155/2020/4597827