Satisfying due-dates in a job shop with sequence-dependent family set-ups

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure

This paper addresses a static, n-job, single-machine scheduling problem with sequence dependent family setups. The setup matrix follows a special structure where a constant setup is required only if a job from a smaller indexed family is an immediate successor of one from a larger indexed family. The objective is to minimize the maximum lateness (Lmax). A two-step neighborhood search procedure ...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

Job Shop Scheduling with Fixed Delivery Dates

Abstract—In most classical scheduling models, a job is assumed to deliver to a customer at the instant of a job processing completion. In numerous practical situations, however, multiple delivery dates exist, where the time interval between any two consecutive delivery dates is constant. This type of fixed delivery strategy results in substantial cost savings for transportation and handling. Th...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2003

ISSN: 0020-7543,1366-588X

DOI: 10.1080/0020754031000149167