منابع مشابه
Intelligent Application at the 400/120 Kv Substation of the Paks Nuclear Power Plant
A complete reconstruction program was started at the electrical substation of the Paks Nuclear Power Plant to assist the Hungarian high voltage network to join the European network. At the operator level a new, PC-based SCADA (Supervisory Control and Data Acquisition) system was introduced. An AI-based, intelligent advisory system was developed and embedded into the SCADA system. The first part...
متن کاملAlert State Detection and Switching Order Generation at a 400/120 kV Substation using Knowledge Server
At the operator level a new, PC-based SCADA system was introduced at the electrical substation of the Paks Nuclear Power Plant. An AI-based, intelligent advisory system was developed and connected to the SCADA system as knowledge server. The paper describes some of the advisory functions and their realizations in rules and procedures. Besides increasing reliability and safety of energy supply t...
متن کاملImplantable Cardioverter Defibrillators in Magnetic Fields of a 400 kV Substation
Workers using an implantable cardioverter defibrillator (ICD) are classified by European Directive 2013/35/EU as being at particular risk because of the potential interference between implanted medical devices and electromagnetic fields. The aim of the study was to investigate ICD function using a human-shaped phantom in high magnetic fields of a shunt reactor at a 400 kV substation. We used th...
متن کاملElectric Field Analysis and Experimental Evaluation of 400 kV Silicone Composite Insulator
Abstract—In electrical power system, high voltage insulators are necessary for consistent performance. All insulators are exposed to different mechanical and electrical stresses. Mechanical stresses occur due to various loads such as wind load, hardware and conductors weight. Electrical stresses are due to over voltages and operating voltages. The performance analysis of polymer insulators is a...
متن کاملCurrent densities and total contact currents during forest clearing tasks under 400 kV power lines
The aim of the study was to analyze all values of electric currents from measured periods while performing tasks in forest clearing. The objective was also to choose and analyze measurement cases, where current measurements successfully lasted the entire work period (about 30 min). Two forestry workers volunteered to perform four forest clearing tasks under 400 kV power lines. The sampling freq...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Acta Radiologica
سال: 1953
ISSN: 0001-6926
DOI: 10.3109/00016925309135319