Rock Breaking Performance of Two Disc Cutters of Tunnel Boring Machine for Safe Tunneling in Unstable Coal Rock Stratum

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine

Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stre...

متن کامل

Factors influencing performance of hard rock tunnel boring machines

Intact rock properties together with rock mass characteristics should be well investigated for selection of proper tunnel boring machine (TBM) for tunneling in various ground conditions. This is due to the significant impact of rock mass characteristics on machine performance. TBMs are site specific and designed for optimal performance in given ground conditions. When selected and put to work a...

متن کامل

Optimal disc cutters plane layout design of the full-face rock tunnel boring machine (tbm) based on a multi-objective genetic algorithm

Improving of the quality of the disc cutters’ plane layout design of the full-face rock tunnel boring machine (TBM) is the most effective way to improve the global performance of a TBM. The plane layout design of disc cutters contains multiple complex engineering technical requirements and belongs to a multi-objective optimization problem with multiple nonlinear constraints. Based on analysis o...

متن کامل

Numerical Analysis on Rock Breaking by Disc Cutters with Different Joint Characteristics

RESEARCH ARTICLE Numerical Analysis on Rock Breaking by Disc Cutters with Different Joint Characteristics Tan Qing, Yi Nian-en, Xia Yi-min, Zhang Xu-hui, Jiang Bo, Yang Yang and Yizeng Siyuan State Key Laboratory of High Performance Complex Manufacturing, Central South University, Changsha, Hunan 410083, China School of Mechanical and Electrical Engineering, Central South University, Changsha, ...

متن کامل

Engineering geological studies used for redesigning and employing a hard rock TBM in soft rock formations of Chamshir water conveyance tunnel

The Chamshir water conveyance tunnel (CWCT) with a length of 7.4 km and boring diameter of 5.3 m is excavated using a refurbished single shield TBM, initially designed to work in hard rock formations. This study focuses on engineering geological issues, which are important for checking the suitability of this machine and proposing required modifications for improving its performance in soft roc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Safety and Security Engineering

سال: 2020

ISSN: 2041-9031,2041-904X

DOI: 10.18280/ijsse.100508