Rock-Breaking Performance of Cutters of Tunnel Boring Machine in Broken Coal Rock Formation
نویسندگان
چکیده
منابع مشابه
Simulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine
Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stre...
متن کاملFactors influencing performance of hard rock tunnel boring machines
Intact rock properties together with rock mass characteristics should be well investigated for selection of proper tunnel boring machine (TBM) for tunneling in various ground conditions. This is due to the significant impact of rock mass characteristics on machine performance. TBMs are site specific and designed for optimal performance in given ground conditions. When selected and put to work a...
متن کاملOptimal disc cutters plane layout design of the full-face rock tunnel boring machine (tbm) based on a multi-objective genetic algorithm
Improving of the quality of the disc cutters’ plane layout design of the full-face rock tunnel boring machine (TBM) is the most effective way to improve the global performance of a TBM. The plane layout design of disc cutters contains multiple complex engineering technical requirements and belongs to a multi-objective optimization problem with multiple nonlinear constraints. Based on analysis o...
متن کاملCalculation of tunnel behavior in viscoelastic rock mass
Wall displacements and ground pressure acting on the lining of a tunnel increase with time. These time-dependent deformations are both due to face advance effect and to the time-dependent behavior of the rock mass. Viscoelastic materials exhibit both viscous and elastic behaviors. Thorough this study, the effect of different linear viscoelastic models including Maxwell, Kelvin and Kelvin-Voigt...
متن کاملSimulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Safety and Security Engineering
سال: 2020
ISSN: 2041-9031,2041-904X
DOI: 10.18280/ijsse.100103