منابع مشابه
Scheduling Freight Trains in Rail-Rail Transshipment Yards
Transshipment yards, where gantry cranes allow for an e cient transshipment of containers between di erent freight trains, are important entities in modern railway systems and facilitate the general shift from point-to-point transport to hub-and-spoke railway systems. Modern rail-rail transshipment yards accelerate container handling, so that multiple smaller trains with equal destination can b...
متن کاملRobust trajectory tracking for a reversing tractor trailer
Tractor-trailer reversing is a classical non-linear control problem in which many of the solutions proposed in the literature perform poorly in the presence of real-world constraints such as steering angle, rate limits and lags. In this paper we describe a new method in which an inner loop controls the hitch-angle of the trailer creating a virtual articulated vehicle to which existing control t...
متن کاملSafe Yards: Improving Urban Health through Lead-Safe Yards
biomedical l interventions and prevention strategies. It is an issue that has been a concern of public health officials for decades and has been addressed quite successfully from a national perspective. By eliminating two major sources of exposures—leaded gasoline and leaded paint—blood lead levels for the majority of Americans have dropped dramatically over the past two decades. Unfortunately,...
متن کاملCoordinated Control of a Tractor-Trailer and a Combine Harvester by Neural Adaptive Robust Control
In this paper, the coordinated control problem of a tractor-trailer and a combine harvester is taken into account in the presence of model uncertainties by using the leader-following approach to track a reference trajectory for the first time. At first, a second-order leader-follower dynamic model is developed in Euler-Lagrange form which preserves all structural properties of the dynamic model...
متن کاملRobust Scheduling in Construction Engineering
In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: OR Spectrum
سال: 2020
ISSN: 0171-6468,1436-6304
DOI: 10.1007/s00291-020-00599-5