Robust Optimization for RCPSP Under Uncertainty

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust optimization under multiband uncertainty

We provide an overview of the main results that we obtained studying uncertain mixed integer linear programs when the uncertainty is represented through the new multiband model [4]. Such model extends and refines the classical one proposed by Bertsimas and Sim [2] and is particularly suitable in the common case of arbitrary non-symmetric distributions of the uncertainty. Our investigations were...

متن کامل

Options for Robust Airfoil Optimization under Uncertainty

A robust optimization method is developed to overcome point-optimization at the sampled design points. This method combines the best features from several preliminary methods proposed by the authors and their colleagues. The robust airfoil shape optimization is a direct method for drag reduction over a given range of operating conditions and has three advantages: (1) it prevents severe degradat...

متن کامل

Robust Local Search for Solving RCPSP/max with Durational Uncertainty

Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the importance of these problems, providing scalable solution schedules for RCPSP/max problems is a topic of extensive research. However, all existing methods for solving...

متن کامل

A Robust Optimization Methodology for Multi-objective Location-transportation Problem in Disaster Response Phase under Uncertainty

This paper presents a multi-objective model for location-transportation problem under uncertainty that has been developed to respond to crisis. In the proposed model, humanitarian aid distribution centers (HADC), the number and location of them, the amount of relief goods stored in distribution centers, the amount of relief goods sent to the disaster zone, the number of injured people transferr...

متن کامل

Robust Partial Order Schedules for RCPSP/max with Durational Uncertainty

In this work, we consider RCPSP/max with durational uncertainty. We focus on computing robust Partial Order Schedules (or, in short POS) which can be executed with risk controlled feasibility and optimality, i.e., there is stochastic posteriori quality guarantee that the derived POS can be executed with all constraints honored and completion before robust makespan. To address this problem, we p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Software Engineering & Applications

سال: 2016

ISSN: 0976-2221,0975-9018

DOI: 10.5121/ijsea.2016.7205