Risk study on supply chain management in construction (Case study: Building projects in Indonesia)

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

predicting intention to adopt interorganizational linkages: a study in iranian automative indusrty supply chain in b2b environment

در این پایان نامه مسایل مربوط به ارتباطاط سازمانی و نحوه تاثیر گذاری فناوری اطلاعات بر روی آنها بررسی میشود. انواع مدلهای سازمانی و بررسی متغیرهای مختلف بصورت آماری از اهداف این پایان نامه می باشد. ارتباطاط edi در محیط های b2b هدف اصلی مدل های بررسی شده می باشد.

15 صفحه اول

The Effect of Risk Management on Supply Chain Management (Case Study: SAIPA Company)

The present study aimed to determine the effect of risk management on supply chain management(case study: Saipa Company). This study was applied in terms of purpose and descriptive-correlational in terms of data collection method. The tools used in this study include the 29-item questionnaire. The statistical population of this study included 110 managers of Saipa Company in Tehran. In this stu...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2019

ISSN: 1757-899X

DOI: 10.1088/1757-899x/669/1/012042