Risk register: an integrated governance approach

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Approach to Register Binding and Scheduling

| Code generation methods for DSP applications are hampered by the combination of tight timing constraints imposed by the performance requirements of DSP algorithms, and resource constraints imposed by a hardware architecture. In this paper, we present a method for register binding and instruction scheduling based on the exploitation and analysis of resource-and timing constraints. The analysis...

متن کامل

Childhood bereavement , stress resilience , and cancer risk : an integrated register - based approach

Beatrice Kennedy (2018): Childhood bereavement, stress resilience, and cancer risk: an integrated register-based approach. Örebro Studies in Medicine 171. Accumulating evidence suggests that psychosocial stress and susceptibility to stressful exposures – stress resilience – influence the risk of various health outcomes, but the potential link with cancer occurrence is unclear. The aims of this ...

متن کامل

Risky Pollution Index: An Integrated Approach Towards Determination of Metallic Pollution Risk in Sediments

In contrast with Mobility Factor (MF) and Risk Assessment Code (RAC) indices, IR attributes a risk share to metal species bound to reducible and oxidizable phases which are totally neglected in both of the two above-mentioned indices. In other words, besides the absolutely mobile fractions, the potentially mobile ones are also regarded in risk evaluation process elaborated by IR. The different ...

متن کامل

Load Carriage: An Integrated Risk Management Approach.

Military load carriage (LC) gives rise to substantial risks to soldier health, tactical performance, and mission success. The aim of this article was to extract and synthesize the key findings of a series of LC research reports previously published by the authors. Five reviews and 6 studies were included, with key findings extracted and synthesized in tabulated and critical narrative form. The ...

متن کامل

Overview of an internationally integrated nanotechnology governance★

Nanoscience and nanotechnologies (NTs) have huge potential to improve competitiveness and sustainable development across a wide range of industrial sectors. Public perception of NT related to health, safety and environment (HSE) is critical for the responsible development of NT. It warrants a regulatory regime to demonstrate to the general public whether NTs are safe with regard to HSE. This wo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: BMJ Supportive & Palliative Care

سال: 2011

ISSN: 2045-435X,2045-4368

DOI: 10.1136/bmjspcare-2011-000105.205