Risk Mitigation on Infrastructure Port Project Construction (Case Study: Sanur Port Project, Bali, Indonesia)

نویسندگان

چکیده

Port construction projects have complex work stages and high dependence on internal external conditions so that the emergence of risks can cause project delays is elevated. Therefore, it necessary to apply risk management identify overcome will come. This research uses Analytic Hierarchy Process (AHP) method rank determine most dominant parameters for analysis. study shows there are 4 delay parameter Sanur project, with wave parameter. The effect in 98 days. To reduce impact may occur, mitigation carried out aspects workers, tools, methods implementation.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

A new method for Project risk identification: Case study of a real construction project

Compared with many other sectors, a construction project is a subject to more risks due to its specific characteristics such as long period, complicated processes, abominable environment, financial intensity and dynamic organization structure. Managing risks is recognized as a very important management process in order to assure its successful delivery. It aims at identifying sources of risk an...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S web of conferences

سال: 2023

ISSN: ['2555-0403', '2267-1242']

DOI: https://doi.org/10.1051/e3sconf/202338801006