In a global society, in which geotechnical projects are increasingly designed country other than the one where construction takes place, risk management must be extended to cover infrastructure works, smaller dams and tunnels, for example, since there is significant impact on works budget imponderables. Therefore, methodology based likelihood of occurrence certain events their economic consequences proposed, applicable bored piles (Kelly drilled) coarse soils, easy use, simple implement initial stage construction. Of 12 case studies involving carried out Luanda (Angola), two selected examples proposed sandy soil layers with interbedded clays discussed. Subsequently, whether overall foundation contract affected by assessed determined, what influence it has light mitigating factors associated real costs. This method intended encourage adaptation sustainable site project managers, analysis concurrently budgetary review. Though level technical may acceptable, costs question not acceptable.
منابع مشابه
Simulation of Bored Pile Construction
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both pili...
متن کاملNear Real-Time Decision Support for Disaster Management: Hurricane Sandy
Assessing vulnerability is fundamental for efficient risk management and emergency response. Integrating analyses from preparedness and risk reduction to inform the response phase requires that structural information about demographics or industry is combined with specific local information that highlights hotspots or emerging risks in near real-time. Owing to its availability on social media o...
متن کاملconstruction of vector fields with positive lyapunov exponents
in this thesis our aim is to construct vector field in r3 for which the corresponding one-dimensional maps have certain discontinuities. two kinds of vector fields are considered, the first the lorenz vector field, and the second originally introced here. the latter have chaotic behavior and motivate a class of one-parameter families of maps which have positive lyapunov exponents for an open in...
15 صفحه اولRheoStat: Real-Time Risk Management
As the frequency of attacks faced by the average host connected to the Internet increases, reliance on manual intervention for response is decreasingly tenable. Operating system and application based mechanisms for automated response are increasingly needed. Existing solutions have either been customized to specific attacks, such as disabling an account after a number of authentication failures...
متن کاملReal-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites
The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on constructio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Infrastructures
سال: 2021
ISSN: ['2412-3811']
DOI: https://doi.org/10.3390/infrastructures6050077