Risk Management Methods in Projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Risk Management in Construction Projects

The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...

متن کامل

Risk Management for Contractors in Marine Projects

V. W. Y. Tam · L. Y. Shen · Risk Management for Contractors in Marine Projects ... · pp 403-410 Introduction Marine projects are one of major work in the Hong Kong construction industry. More than forty marine projects are in progress by the Hong Kong government (see Table 1) (Hong Kong Government, 2007), which include bulkheads, seawalls, foundation piles, docks, inspections, piers dredging an...

متن کامل

Lightweight Risk Management in Agile Projects

Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due to for example, more frequent and earlier feedback, shorter periods of development time and easier predic...

متن کامل

Risk management in small construction projects

Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for proj...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Eastern Europe Research in Business and Economics

سال: 2018

ISSN: 2169-0367,2169-0367

DOI: 10.5171/2018.790198