Risk identification framework in construction of Egyptian mega housing projects
نویسندگان
چکیده
Egypt's population is increasing and expected to exceed 120 million by 2050. Egypt constructed mega housing projects (M.H.P) cater with that escalation in population. The Egyptian strategy 2030 prioritized the construction of M.H.P. Contractors’ have struggled manage risks deliver successfully. aim paper develop a conceptual risk identification framework improve contractors’ practices during Egypt. objectives are analyse management M.H.P (CRIF). reviewed literature identified projects. Through constructivism paradigm, adopted interview technique allocated recent practice. Qualitative information analysed using NVivo tool for qualitative analysis. used ISO 31,000 as backdrop design (CRIF), computerized database (CRID) visual basic programming. further produced generic guidelines support use CRIF Availability resources, poor financial status, weak technical training were most common worldwide. presented breakdown structure (R.B.S) included opportunities challenges Egypt’s main Management Resources, Project Management, Cash flow issues. guides knowledge, management. CRID improves providing future framework. updates process adding multidisciplinary elements including communication, considering context building frameworks. enhances capability allowed researchers project
منابع مشابه
Project Governance Framework for Mega Construction Projects (MCPs) in China: Lessons from SHITH and SHCBD projects
We analyse governance in two mega construction projects (MCPs): Shanghai Hongqiao Integrated Transportation Hub (SHITH) project and Shanghai Hongqiao central Business district (SHCBD). We suggest that the governance of mega construction projects in China needs the participation of construction headquarter and three coordination platforms, namely, design coordination platform, schedule platform ...
متن کاملAnalyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...
متن کاملChallenges of mega construction projects in developing countries
Mega Construction Projects (MCPs) represent a strategic option towards achieving sustainable development objectives in developing countries. On the one hand, these projects are charaterised with the need for high design knowledge and technical skills; competent human resources and managerial capabilities as well as excessive cost investment. Conversely, developing countries experience shortage ...
متن کاملEquitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملRisk Management in Construction Projects
The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Ain Shams Engineering Journal
سال: 2021
ISSN: ['2090-4479', '2090-4495']
DOI: https://doi.org/10.1016/j.asej.2020.09.016