Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

design and explanaion of national projects managers’ competencies, focusing on risk

every year, for realizing the goals of five-year state civil development plan, a great part of state credits and financial resources are spent for investment in national projects, whilst most of national projects are performed with considerable delay. essential objectives of applying this research is design and explanaion of national projects managers’ competencies model, focusing on risk that ...

متن کامل

financial risk assessment model for lng projects, case study: iran lng project

in this study, in order to consider the effects of cash flow fluctuations on project profitability, the new risk kind indicators are proposed to assess projects risk. firstly, project cash flow calculates on the basis of cost and revenue data in an lng project. then distribution curves of two variables, oil price and interest rate of foreign loans, are utilized to determine distribution curve o...

متن کامل

Risk Identification Patterns for Software Projects

The paper presents a systematic approach to software risk identification based on risk patterns. The approach assumes explicit modelling of the relevant business process that provides for controlling the scope and ensures the completeness of the analyses. We demonstrate how this approach can be applied using RUP as the reference model of software processes. Then we report on the validation expe...

متن کامل

Implementation Procedures for the Risk in Early Design (RED) Method

Risk assessments performed at the conceptual design phase of a product may offer the greatest opportunity to increase product safety and reliability at the least cost. This is an especially difficult proposition, however, as often the product has not assumed a physical form at this early design stage. This paper introduces the Risk in Early Design (RED) method, a method for performing risk asse...

متن کامل

Thermal Efficiency – Design, Lifecycle, and Environmental Considerations in LNG Plant Design

Thermal efficiency is a common benchmark used to compare competing processes when a new LNG project is being developed. Often this type of comparison can be misleading when used in isolation because plant design premises are not consistent from project to project. Thermal efficiency depends on numerous issues such as gas composition, inlet pressure and temperature, and even more obscure issues ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Korean Journal of Construction Engineering and Management

سال: 2011

ISSN: 2005-6095

DOI: 10.6106/kjcem.2011.12.5.146