Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation

نویسندگان

چکیده

In the Small Island Developing States (SIDS), public sector infrastructure projects (PSIPs) fail to both meet targeted performance metrics and deliver on intended benefits society. terms of cost metric, overruns (COs) beyond initial contract value are more a norm than unique occurrence. Therefore, ensure economic sustainability for SIDS, money PSIPs, there is need investigate evaluate risk impacts COs. The purpose this research was identify perceived overrun factors that within primary project stakeholders’ sphere control, reduce ongoing ambiguities exist in prioritization these risks. This achieved by extracting critical from selected comparative studies developing countries formulate closed-ended questionnaire be administered construction professionals Trinidad Tobago. Thereafter, process fuzzy synthetic evaluation (FSE) used develop model based three tiers risks: 11 factors, 3 groupings (CRGs) an overall level (ORL). results showed two highest-ranked risks were funding problems variations client. leading grouping client-related (5.370), followed professional-related (4.815) physical (4.870). ORL 5.068. Based FSE’s linguistic scaling, CRGs high PSIPs. adds CO body knowledge primarily ways. Firstly, study extends assessment previously undertaken scholarship into context SIDS build generalizability context-specific phenomenon. Secondly, FSE provides practical tool promoted use SIDS’ industry among practitioners focus prioritize planning phases improve contemporary practices execution projects. Finally, quantitative approach recommended supplement traditional qualitative management adopted thus contributing towards improved viability

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

AGILITY EVALUATION IN PUBLIC SECTOR USING FUZZY LOGIC

Agility metrics are difficult to define in general, mainly due to the multidimensionality and vagueness of the concept of agility itself. In this paper, a knowledge-based framework is proposed for the measurement and assessment of public sector agility using the A.T.Kearney model. Fuzzy logic provides a useful tool for dealing with decisions in which the phenomena are imprecise and vague. In th...

متن کامل

designing a model for selecting construction projects in public sector

much research hasn’t been done in the area of project selection in the public sector. in this paper, we tried to choose projects in the public sector, and a linear programming model is presented. in an effort to build the model, the decision criteria were identified using the delphi method and then the criteria were reviewed at conceptual combining. the model was constructed in a linear, goal a...

متن کامل

the impact of e-readiness on ec success in public sector in iran the impact of e-readiness on ec success in public sector in iran

acknowledge the importance of e-commerce to their countries and to survival of their businesses and in creating and encouraging an atmosphere for the wide adoption and success of e-commerce in the long term. the investment for implementing e-commerce in the public sector is one of the areas which is focused in government‘s action plan for cross-disciplinary it development and e-readiness in go...

evaluation of sadr eminence in safavid period

چکیده: یکی از دوره های مهم تاریخی ایران به لحاظ تأمین استقلال ملی مذهبی و حتی تأثیر آن بر فرهنگ و مذهب ایرانیان، دوره صفویه است. رسمیت دادن و رواج مذهب شیعه توسط شاه اسماعیل اول، یکی از مهمترین اقدامات این دولت محسوب می شود. بنابراین برای اجرای این سیاست، وی منصب صدارت را به عنوان منصبی مذهبی- حکو متی ایجاد کرد .این منصب از دوره ی تیموریان ایجاد شده بود ولی در اواخر این دوره اهمیت بیشتری یافت...

15 صفحه اول

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2023

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings13051116