Risk-based optimal scheduling of maintenance activities in a railway network
نویسندگان
چکیده
منابع مشابه
Genetic and memetic algorithms for scheduling railway maintenance activities
Nowadays railway companies are confronted with high infrastructure maintenance costs. Therefore good strategies are needed to carry out these maintenance activities in a most cost effective way. In this paper we solve the preventive maintenance scheduling problem (PMSP) using genetic algorithms, memetic algorithms and a two-phase heuristic based on opportunities. The aim of the PMSP is to sched...
متن کاملA Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملOptimal Scheduling of Connections in Railway Systems
Complex railway networks typically consist of widely diffused OD-pairs by which it is impossible to provide direct trips only. Therefore, passengers often have to change trains at transfer stations. Guaranteeing scheduled connections is complicated by delays during operation. To improve and maintain the quality of transfers requires optimal scheduling and control of connections at transfer stat...
متن کاملA Comprehensive Approach for Railway Crew Scheduling Problem (Case Study: Iranian Railway Network)
The aim of this study is to propose a comprehensive approach for handling the crew scheduling problem in the railway systems. In this approach, the information of different railway trips are considered as input and the problem is divided to three separated phases. In phase I, we generate all feasible sequences of the trips, which are named as the pairings. A depth-first search algorithm is deve...
متن کاملA heuristic approach to railway track maintenance scheduling
Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal schedu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EURO Journal on Transportation and Logistics
سال: 2019
ISSN: 2192-4376
DOI: 10.1007/s13676-018-0117-z