Risk based initial cost assessment while planning a hydropower project

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

Planning while Executing: A Constraint-Based Approach

We propose a planning architecture where the planner and the executor interact with each other in order to face dynamic changes of the application domain. According to the deferred planning strategy proposed in [14], a plan schema is produced o -line by a generative constraint based planner and re ned at execution time by retrieving up-todate information when that available is no longer valid. ...

متن کامل

Tunable-Risk Sampling-Based Path Planning Using a Cost Hierarchy

We propose a new sampling-based path planning algorithm, the Optimal Minimum Risk Rapidly-Exploring Random Tree (MR-RRT*), that plans minimum risk paths in accordance with primary and secondary cost criteria. The primary cost criterion is a user-defined measure of accumulated risk, which may represent proximity to obstacles, exposure to threats, or similar. Risk is only penalized in areas of th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy Strategy Reviews

سال: 2020

ISSN: 2211-467X

DOI: 10.1016/j.esr.2020.100517