Risk-Based Capital Framework: Conventional vs. Takaful Operators

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Duffie Nikunj Kapadia Risk - Based Capital Standards , Deposit Insurance and Procyclicality Risk - Based Capital Standards

Large U.S. banks dramatically increased their capitalization during the 1990s, to the highest levels in more than 50 years. We document this buildup of capital and evaluate several potential motivations. Our results support the hypothesis that regulatory innovations in the early 1990s weakened conjectural government guarantees and enhanced the bank counterparties’ incentive to monitor and price...

متن کامل

A comparative study of Takaful and conventional insurance: empirical evidence from the Malaysian market

The purpose of this paper is to distinguish between the performance levels of the Malaysian Takaful and conventional life insurance industries with a view to better informing the decisions of stakeholders. Our analysis makes use of financial ratios and macro-economic variables namely Gross Domestic Product (GDP), Consumer Price Index (CPI) and Treasury Bill Rate (TBR). We use two stage analysis...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Management Research

سال: 2015

ISSN: 1941-899X

DOI: 10.5296/jmr.v7i2.6922