Risk assessment methodology for high-pressure CO2 pipelines incorporating topography
نویسندگان
چکیده
منابع مشابه
A Review of Manufacturing Process of Polyethylene Pipe and Connectors for Applying in High-Pressure Natural Gas Pipelines
In this article various pipes used for transporting of gas are introduced and pros and cons of each one are elucidated. The pipes are categorized in three different subgroups including metallic, polymeric and metallic-wire reinforced polymeric pipes. Metallic-wire reinforced polymeric pipes are nominated as the best option for usage in high pressure pipelines transporting natural gas. As a resu...
متن کاملMethodology for qualitative urban flooding risk assessment.
Pluvial or surface flooding can cause significant damage and disruption as it often affects highly urbanised areas. Therefore it is essential to accurately identify consequences and assess the risks associated with such phenomena. The aim of this study is to present the results and investigate the applicability of a qualitative flood risk assessment methodology in urban areas. This methodology ...
متن کاملMethodology issues in risk assessment for radon.
The alpha dose per unit radon daughter exposure in mines and homes is comparable at about 5 mGy/WLM. This means that excess lung cancer risk determined in follow-up studies of miners should be valid to extrapolating to environmental populations. There are several models currently used for risk projection to estimate lung cancer in the U.S. from indoor radon exposure. The accuracy of the estimat...
متن کاملA Methodology for Software Reliability Risk Assessment
Software reliability risk assessment based on its architecture is an important technology used to assure the quality of software products early in the software lifecycle. In this paper, we expand the work of “A methodology for architecture level reliability risk analysis” by S.Yacoub and et al. to present a more simple methodology for risk assessment at the design stages of the software develop...
متن کاملMetallurgical Analysis of High Pressure Gas Pipelines Rupture
On 6 July 2004, two parallel-running gas pipelines (18-inch and 24-inch diameters), in the main transmission network of SNGPL (a gas company in Pakistan) were ruptured. The ruptures occurred in the early hours of the morning about 8 miles downstream of the compressor station AC-4. The ruptures were indicated by the increased gas flow at the outlet of AC-4 [1], first at about 0648 hours and then...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Process Safety and Environmental Protection
سال: 2014
ISSN: 0957-5820
DOI: 10.1016/j.psep.2013.09.003