Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling
نویسندگان
چکیده
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملMulti-mode resource constrained multi-project scheduling and resource portfolio problem
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. Three issues arise when investigating this multi-project environment. First, the total b...
متن کاملPreemption in multi-mode Resource-constrained project scheduling problem
Preemption in multi-mode Resource-constrained project scheduling problem Zahra Zare* Department of Industrial Engineering Najafabad Branch, Islamic Azad University, Isfahan, Iran Postal Code: 71767-13763, Unit 3, No 142, 6 Alley, South Bahonar St., Shiraz, Iran Abdulreza Naddaf Department of Management Shiraz University, Shiraz, Iran Maysam Ashrafzadeh Department of Industrial Engineering Najaf...
متن کاملThe Resource-Constrained Multi-Mode Project Scheduling Problem
This chapter reports on a new solution approach for the multi-mode resource-constrained project scheduling problem (MRCPSP, MPS|prec|Cmax). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and non-renewable) resource-feasible project schedule with a minimal makespan. The problem type is known to b...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Mathematics in Operational Research
سال: 2019
ISSN: 1757-5850,1757-5869
DOI: 10.1504/ijmor.2019.10022360