Resource Optimization in Multi-Tier HetNets Exploiting Multi-Slope Path Loss Model

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Downlink Coverage Probability in Multi - Tier Rician Fading HetNets

Heterogeneous cellular networks (HetNets), consisting of macrocells overlaid with small cells, have become an integral part of existing cellular wireless networks to satisfy an ever increasing demand for mobile broadband applications and services. In this paper, the coverage probability in a downlink HetNet, comprising of multi-tier MIMO Base Stations (BSs) serving multiple users, assuming Rici...

متن کامل

Energy-Aware Radio Resource Management in D2D-Enabled Multi-Tier HetNets

Hybrid networks consisting of both millimeter wave (mmWave) and microwave (μW ) capabilities are strongly contested for next generation cellular communications. A similar avenue of current research is deviceto-device (D2D) communications, where users establish direct links with each other rather than using central base stations (BSs). However, a hybrid network, where D2D transmissions coexist, ...

متن کامل

Multi-Tier Data Access & Hierarchical Memory Optimization

Building robust and reliable storage systems and memory hierarchies is very important in modern computing environment because hierarchical memory architecture is present almost everywhere. This hierarchy is not limited to attached devices, but it expands to middle-tiers, web caches, and network and internet storage. So optimizing access of the data stored along all these hierarchical levels is ...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2017

ISSN: 2169-3536

DOI: 10.1109/access.2017.2699941