RESOURCE LEVELLING IN REPETITIVE CONSTRUCTION PROJECTS WITH INTERRUPTIONS: AN INTEGRATED APPROACH

نویسندگان

چکیده

Despite the significance of resource levelling, project managers lack various ways to smooth usage fluctuation a repetitive construction besides changing usage. Tolerating interruptions is an effective way provide flexibility for schedule but ignored when solving levelling problems. Therefore, this paper investigates impacts on and develops integrated approach that simultaneously integrates two scheduling adjusting processes: tolerating interruptions. In paper, interruption conditions are proposed identify which activities suitable be interrupted smoothing fluctuation. The traditional model modified new by incorporating A two-stage GA-based algorithm developed integrating commonly used pipeline adopted illustrate steps demonstrate its effectiveness superiority through comparison with previous studies. large-scale further verifies usability approach. results confirmed feasibility interruptions, can achieve more competitive result.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource-driven Scheduling for Repetitive Projects: a Pull-system Approach

Having resources work continuously has long been the goal for scheduling repetitive projects. Waste (unforced idleness) in repetitive projects is observed when labor and equipment (resources) are waiting, being idle, because the preceding resources have not finished their jobs. In this paper we investigate the existence and influence of unforced idleness. In contrast to the push-system approach...

متن کامل

Fuzzy Scheduling of Repetitive Construction Projects

Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...

متن کامل

Optimisation of Construction Resource Allocation and Levelling Using Genetic Algorithm

Resource allocation and levelling is one of the top challenges in construction project management, due to complex nature of the construction projects.CPM and PERT is most commonly used methods for scheduling of construction projects. However it is not capable of minimising undesirable fluctuations in resource utilisation profile. This research describes a Genetic algorithm approach to resource ...

متن کامل

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

A Methodology for Integrated Buffer Design and Management in Repetitive Construction Projects

One important challenge of production systems in both manufacturing and construction is the management of the harmful impacts of variability. While both industries have commonly used buffer-based production strategies to deal with the variability issue, construction is characterized for using intuitive, non-general and wasteful buffering strategies. For overcoming these limitations, this paper ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Civil Engineering and Management

سال: 2023

ISSN: ['1392-3730', '1822-3605']

DOI: https://doi.org/10.3846/jcem.2023.17568