Resource Leveling with Soft Precedence Relations
نویسندگان
چکیده
منابع مشابه
Multi-armed bandit problem with precedence relations
Abstract: Consider a multi-phase project management problem where the decision maker needs to deal with two issues: (a) how to allocate resources to projects within each phase, and (b) when to enter the next phase, so that the total expected reward is as large as possible. We formulate the problem as a multi-armed bandit problem with precedence relations. In Chan, Fuh and Hu (2005), a class of ...
متن کاملA new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
In this paper we propose a new lower bound for the resource constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better ...
متن کاملMulti-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
This study addresses the resource-constrained project scheduling problem with precedence relations, and aims at minimizing two criteria: the makespan and the total weighted start time of the activities. To solve the problem, five multi-objective metaheuristic algorithms are analyzed, based on Multi-objective GRASP (MOG), Multiobjective Variable Neighborhood Search (MOVNS) and Pareto Iterated Lo...
متن کاملA Soft Global Precedence Constraint
Hard and soft precedence constraints play a key role in many application domains. In telecommunications, one application is the configuration of callcontrol feature subscriptions where the task is to sequence a set of user-selected features subject to a set of hard (catalogue) precedence constraints and a set of soft (user-selected) precedence constraints. When no such consistent sequence exist...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: DEStech Transactions on Computer Science and Engineering
سال: 2017
ISSN: 2475-8841
DOI: 10.12783/dtcse/cmsam2017/16399