Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-projects Scheduling with Resource Constraints & Priority Rules by the Use of Simulated Annealing Algorithm

Original scientific paper This paper presents a hybrid genetic algorithm for assembly flow-shop scheduling problem with sequence-dependent setup and transportation times, with objectives, namely the minimizing of weighted, sum of total weighted squared tardiness, makespan, and total weighted squared earliness and number of tardy jobs. Since the problem is NP-hard, we solved this problem by hybr...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

Optimization model for resource assignment problems of linear construction projects

For linear construction projects, it has long been known that resource utilization is i]mportant in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This study presents a flexible model for resolving linear scheduling problems involving different objectives and resource assignment tasks. The proposed model adopts constraint...

متن کامل

Using simulated annealing for resource allocation

Many resource allocation issues, such as land useor irrigation planning, require input from extensive spatial databases and involve complex decisionmaking problems. Spatial decision support systems (SDSS) are designed to make these issues more transparent and to support the design and evaluationof resource allocation alternatives. Recent developments in this Ž eld focus on the design of allocat...

متن کامل

Stochastic Scheduling with Multiple Resource Constraints Using a Simulated Annealing-based Algorithm

This paper proposes a new algorithm using Simulated Annealing (SA) for stochastic scheduling. Stochastic effects are added with nondeterministic activity durations. Simple simulated annealing can not properly handle such a complex problem so an improved version is produced and utilized within the algorithm. Generally, the availability of resources is not enough to complete all the current activ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Canadian Journal of Civil Engineering

سال: 2019

ISSN: 0315-1468,1208-6029

DOI: 10.1139/cjce-2017-0670