Resource leveling for a mass digitization project

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Leveling in Fuzzy Project Scheduling

In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...

متن کامل

A Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems

The project resource leveling problem was proposed to smooth resource usage and reduce resource fluctuation, while the resource-constrained project scheduling problem focuses on minimizing the project duration with limited resources. Solving the two interrelated problems separately is unlikely to result in a globally optimum schedule. The few integrated optimization methods that have been devel...

متن کامل

A Mass Digitization Primer

Many people are talking these days about “digitizing books.” But what does that really mean? This paper describes different kinds of digitizing, the pros and cons of each, and suggests a layered structure for understanding “digitization.” The Digital Age has brought many challenges for librarians. Most obvious are all the issues concerning “born-digital” material that academics and the general ...

متن کامل

A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

متن کامل

Copyright and Mass Digitization

The authors pose several stimulating queries with regard to the suitability of the current legal infrastructure to accommodate new and potential demands brought about by mass digitization. Each query is powerfully pursued, suggesting well-argued responses, but also leaving room for other possible solutions. They explain each topic using clear language and an illustration of some of the most per...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Library Management

سال: 2013

ISSN: 0143-5124

DOI: 10.1108/lm-05-2012-0029