Resource estimation ofin situleach uranium projects
نویسندگان
چکیده
منابع مشابه
Scheduling modular projects on a bottleneck resource
In this paper, we model a research-and-development project as consisting of several modules, with each module containing one or more activities. We examine how to schedule the activities of such a project in order to maximize the expected profit when the activities have a probability of failure and when an activity’s failure can cause its module and thereby the overall project to fail. A module...
متن کاملExperimental Evaluation of Algorithmic Effort Estimation Models using Projects Clustering
One of the most important aspects of software project management is the estimation of cost and time required for running information system. Therefore, software managers try to carry estimation based on behavior, properties, and project restrictions. Software cost estimation refers to the process of development requirement prediction of software system. Various kinds of effort estimation patter...
متن کاملHow (un)reliable are the Red Book Uranium Resource Data?
For more than 40 years, the Nuclear Energy Agency of the OECD countries and the International Atomic Energy Administration of the United Nations have published a biannual document with the title “Uranium Resources, Production and Demand”. This book, known as the “Red Book”, summarizes data about the actual and near future nuclear energy situation and presents the accumulated worldwide knowledge...
متن کاملFundamentals of 3D modelling and resource estimation in coal mining
The prerequisite of maintaining an efficient and safe mining operation is the proper design of a mine by considering all aspects. The first step in a coal mine design is a realistic geometrical modelling of the coal seam(s). The structural features such as faults and folding must be reliably implemented in 3D seam models. Upon having a consistent seam model, the attributes such as calorific val...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Earth Science
سال: 2014
ISSN: 0371-7453,1743-2758
DOI: 10.1179/1743275814y.0000000055