Resource-Constrained versus Demand-Constrained Systems
نویسندگان
چکیده
منابع مشابه
Singular constrained linear systems
In the linear system Ax = b the points x are sometimes constrained to lie in a given subspace S of column space of A. Drazin inverse for any singular or nonsingular matrix, exist and is unique. In this paper, the singular consistent or inconsistent constrained linear systems are introduced and the effect of Drazin inverse in solving such systems is investigated. Constrained linear system arise ...
متن کاملsingular constrained linear systems
in the linear system ax = b the points x are sometimes constrained to lie in a given subspace s of column space of a. drazin inverse for any singular or nonsingular matrix, exist and is unique. in this paper, the singular consistent or inconsistent constrained linear systems are introduced and the effect of drazin inverse in solving such systems is investigated. constrained linear system arise ...
متن کاملStochastic Resource Allocation for Energy-Constrained Systems
Battery-powered wireless systems running media applications have tight constraints on energy, CPU, and network capacity, and therefore require the careful allocation of these limited resources to maximize the system’s performance while avoiding resource overruns. Usually, resource-allocation problems are solved using standard knapsack-solving techniques. However, when allocating conservable res...
متن کاملResource−Constrained Embedded Control and Computing Systems
This thesis deals with methods for handling resource constraints in embedded control systems and real-time computing systems. By dynamic feedback-based resource scheduling it is possible to achieve adaptability and increased performance for these systems. A feedback scheduling strategy is presented, which uses feedback from plant states to distribute computing resources optimally among a set of...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Econometrica
سال: 1979
ISSN: 0012-9682
DOI: 10.2307/1914132