Resource Constrained Project Scheduling With Dynamic Disruption Recovery
نویسندگان
چکیده
منابع مشابه
Disruption management for resource-constrained project scheduling
In this paper, we study the problem of how to react when an ongoing project is disrupted. The focus is on the resourceconstrained project scheduling problem with finish–start precedence constraints. We begin by proposing a classification scheme for the different types of disruptions and then define the constraints and objectives that comprise what we call the recovery problem. The goal is to ge...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA dynamic resource constrained project scheduling problem
In this paper, we present a variant of classical scheduling problems which deal with restricted resources. Unlike other models studied in the literature, the proposed model has no upper bound for the amount of available resources. The objective of this variant is to find a solution that maximises this amount at the end of the planning horizon. A hybrid evolutionary algorithm is proposed for thi...
متن کاملThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملsplittable stochastic project scheduling with constrained renewable resource
this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2020
ISSN: 2169-3536
DOI: 10.1109/access.2020.3014940