Resource-Constrained Construction Scheduling Using Agent Based Modeling Technique
نویسندگان
چکیده
منابع مشابه
resource-constrained scheduling of construction projects using the harmony search algorithm
during the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. this study aims at using an improved version of the harmony search algorithm (hsa) to schedule resource constrained construction projects. this model is formulated as a global optimization problem. it will determine the duration of each activity to minimize the...
متن کاملResource Allocation in Construction Scheduling based on Multi- Agent Negotiation
Computerized project management in construction is traditionally based on precedence diagrams such as PERT or CPM. Resources required for the execution of activities are usually scarce and therefore provide additional constraints to the predecessor-successor relationships. The objective of this NPhard problem, which is also known as Resource Constrained Project Scheduling Problem (RCPSP), is to...
متن کاملSimulating Construction Bidding Using Agent-Based Modeling
Competitive bidding is the main mechanism for allocation of construction projects and consequently price determination of the construction services in the A/E/C industry. While different aspects of construction bidding have been studied in the literature, there is still a need for developing a comprehensive model that captures the complex dynamics of bidding environment by considering interacti...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Civil Engineering and Construction
سال: 2019
ISSN: 2051-7777,2051-7769
DOI: 10.32732/jcec.2019.8.1.25