Research on Water Conservancy Project Construction and Operation Management based on Cost Management
نویسندگان
چکیده
With the development and progress of economy society, management level my country’s construction projects has also been greatly improved, especially in water conservancy projects, cost process made significant progress; industry is order to improve market enterprises. Competitiveness, increase share company, it necessary company an all-round way, maximize economic benefits company.In efficiency operation this study conducts a theoretical analysis project management, taking reinforcement treatment expansion joints culverts main canal first phase diversion supply as research case, analyzes project. This paper comprehensive investigation, proposes repair plan using chemical bonding with external TPO waterstop PTN petroleum asphalt polyurethane joint material, makes detailed investment estimate for implementation. The results show that externally attached materials can meet needs design strengthening culvert. total static engineering, mechanical electrical equipment installation temporary independent costs basic reserve 4,585,800 yuan, which underdrain 3,594,600 line expectations, indicating design. feasible.
منابع مشابه
Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملResearch on Investment Risk Evaluation of Water Conservancy Project based on Support Vector Machine
The paper analyzes characteristics and investment risk of water conservancy project. Based on support vector machine (SVM), the paper explores water conservancy project investment risk evaluation method, establishes the SVM investment risk evaluation mode. The particle swarm optimization algorithm is employed to analyze data efficiently. Detailed empirical results shows effectiveness of the pro...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملInternet based Construction PROJECT Quality Management System
Quality management (QM) systems have been developed and used by many in the construction industry to ensure right things are done and things are done right the first time. However, current quality systems are designed to monitor and control the “production process” of a specific organization, with the QM data being revealed to the accreditation bodies during the auditing process only. As great ...
متن کاملA New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: E3S web of conferences
سال: 2021
ISSN: ['2555-0403', '2267-1242']
DOI: https://doi.org/10.1051/e3sconf/202127601034