Research on Optimization of Earned Value Management Method in Engineering Budget Management

Earned Value Management Method (EVM), widely used in the world, is a project management method of costschedule integrated control. But the traditional EVM sometimes cannot provide an accurate result. In this paper, a practical method is given to analyze the project performance, in which the Network Diagram Method and the Critical Path Method have been introduced into EVM system that can better ...

متن کامل

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

Analysis and Application of Earned Value Management in Software Development

Earned Value Management (EVM) is a well-known cost and schedule management technique in government and defense industry projects. Its usage, however, is not as wide spread in the general software industry. In this paper we explore some of the shortcomings in EVM and suggest several improvements in the application of EVM in software development projects. In particular, we analyze the nature of s...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

Using Earned Value Management (EVM) in Spiral Development

Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and " No Warranty " statements are included with all reproductions and derivative works. External use. Requests for permission ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Open Civil Engineering Journal

سال: 2015

ISSN: 1874-1495

DOI: 10.2174/1874149501509010369