Research on Optimization of Coal Slime Fluidized Bed Boiler Desulfurization Cooperative Operation
نویسندگان
چکیده
منابع مشابه
Based on Multi-Sensor Information Fusion Circulating Fluidized Bed Boiler Combustion Process Clustering Control Research
Abstract Over the decade, due to the fact that the global energy resources are in deadly shortage, much emphasis is put on the energy consumption in thermal power throughout the world. Following developed is Circulating Fluidized Bed Boiler (CFBB) in recent years, a kind of combustion boiler that can clean and desulfurize the coal efficiently in the combustion process.Circulating Fluidized Bed ...
متن کاملStudy on PIDNN control of circulating fluidized bed boiler based on T-S model
Temperature and pressure are two main parameters of CFBB in the control system. Because of the CFBB possess the characteristics of time-varying, large lag and strong coupling, it is difficult to set up the arithmetical model and achieve better control effects. According to above difficulties, this paper adopts T-S fuzzy modeling method to description the input-output relationship for the contro...
متن کاملFluidized Bed Desulfurization using Lime Obtained after Slow Calcination of Limestone Particles
In this work we have tested the fluidized bed desulfurization performance of lime particles obtained by means of a proprietary limestone slow calcination pre-treatment technique. This performance was compared to that of the parent untreated limestone particles. The occurrence of particle fragmentation and attrition during the fluidized bed operation was also investigated with a specific test pr...
متن کاملIdentification and MPC Control of a Circulation Fluidized Bed Boiler Using an LPV Model
This work studies the identification and control of circulation fluidized bed (CFB) boilers. The CFB boiler under investigation shows strong nonlinearity due to big changes of steam load. A linear parameter varying (LPV) model is used to represent the process dynamics and used in control. The steam flow is used as the working-point variable (scheduling variable) of LPV model. Multivariable plan...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Processes
سال: 2020
ISSN: 2227-9717
DOI: 10.3390/pr9010075