Research on limited buffer scheduling problems in flexible flow shops with setup times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling Flow - Shops with Limited Buffer Spaces

The work described in this paper attempts to validate the implicit assumption in traditional flow shop scheduling research that there is a buffer of infinite capacity between any two adjacent machines. The modified NEH (Nawaz, Encore and Ham) algorithm is used to generate an initial permutation schedule which is then improved by tabu search. For any given sequence, a limited equal buffer size i...

متن کامل

Group Scheduling Problems in Flexible Flow Shops

Flexible flow shops are becoming increasingly common in industry practice because of higher workloads imposed by jobs on one or more stages, thus requiring two or more units of the same machine type. We present a methodology for solving this important problem, namely group scheduling, within the context of cellular manufacturing systems in order to minimize the total completion time of all grou...

متن کامل

New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times

In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...

متن کامل

Sequencing Heuristics for Flexible Flow Shop Scheduling Problems with Unrelated Parallel Machines and Setup Times

This paper presents an investigation of scheduling procedures to seek the minimum of a positively weighted convex sum of makespan and the number of tardy jobs in a static flexible flow shop scheduling environment. The flexible flow shop problem is a scheduling of jobs in a flow shop environment consisting of series of production stages, some of which may have only one machine, but at least one ...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Modelling, Identification and Control

سال: 2019

ISSN: 1746-6172,1746-6180

DOI: 10.1504/ijmic.2019.102360