Research on Dynamic Rotational Grazing Assignment Model based on Grass Resource Leveling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

mortality forecasting based on lee-carter model

over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...

15 صفحه اول

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

Impacts of Rotational Grazing on Soil Carbon in Native Grass-Based Pastures in Southern Australia

Rotational grazing management strategies have been promoted as a way to improve the sustainability of native grass-based pasture systems. From disturbance ecology theory, rotational grazing relative to continuous grazing can increase pasture productivity by allowing vegetation to recover after short intense grazing periods. This project sought to assess whether soil organic carbon (SOC) stocks ...

متن کامل

On-Ranch Grazing Strategies: Context for the Rotational Grazing Dilemma

☆ Research was funded by USDA-NIFA, Rangeland Re 2009-38415-20265); and Western Sustainable Agricultu program (Project Number SW10-073). ⁎ Correspondence: Leslie M. Roche, Department of P University of California, Davis, CA, 95616, USA. E-mail address: [email protected] (L.M. Roche). http://dx.doi.org/10.1016/j.rama.2015.03.011 1550-7424/© 2015 Society for Range Management. Publis Article his...

متن کامل

Dynamic model of milk production responses to grass-based diet variations during grazing and indoor housing

Dairy cow systems based on grassland utilization are characterized by a variation of harvested forage quality from 1 year to another and a fluctuation of grass availability and quality during the pasture season. Consequently, the energy supplied by the diet – i.e., concentrates plus hay or silage in winter and grazing in summer, may not always match animal requirements. A modelling approach ena...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Computer Science

سال: 2019

ISSN: 1877-0509

DOI: 10.1016/j.procs.2019.12.040