Research for Risk Management of Construction Projects in Taiwan

نویسندگان

چکیده

Risks inevitably exist in all stages of a project. In construction project, which is highly dynamic and complex, risk factors affect the expected achievement rates three main performance goals, namely schedule, cost, quality. A comprehensive management procedure requires crucial steps: confirmation, analysis, treatment. Risk analysis core management. Through structural equation modeling, this study developed model that takes different perspective considered occurrence probability events extent to these The contractor dimension was discovered exert strongest influence on an overall followed by subcontractor design dimensions. This paper proposes novel project model, considers entire proposed can be used as reference for managers make decisions about risks, so achieve ultimate goal saving resources sustainable operation

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Management in Construction Projects

The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...

متن کامل

Risk management in small construction projects

Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for proj...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su13042034