Repair and preventive maintenance of photovoltaic modules with degrading backsheets using flowable silicone sealant
نویسندگان
چکیده
Photovoltaic (PV) modules with a degrading backsheet pose challenge for solar park operators and other players in the PV value chain. Some types of backsheets are known to develop cracks because an aging-induced change mechanical characteristics material during operation field, which result loss insulation resistance. In this work, we present solution repair preventive maintenance based on single component flowable silicone sealant. The method fills insulating material, restoring resistance, provides protective layer avoid subsequent degradation. was successfully implemented back co-extruded polyamide (‘AAA’), showed deep following degradation 5–7 years park. repaired had restored resistance several hundred MΩ as observed wet leakage testing maintained high after accelerating aging. This technology can be done field is alternative module replacement.
منابع مشابه
dedekind modules and dimension of modules
در این پایان نامه، در ابتدا برای مدول ها روی دامنه های پروفر شرایط معادل به دست آورده ایم و خواصی از ددکیند مدول ها روی دامنه های پروفر مشخص کرده ایم. در ادامه برای ددکیند مدول های با تولید متناهی روی حلقه های به طور صحیح بسته شرایط معادل به دست آورده ایم و ددکیند مدول های ضربی را مشخص کرده ایم. گزاره هایی در مورد بعد ددکیند مدول ها بیان کرده ایم. در پایان، قضایای lying over و going down را برا...
15 صفحه اولFissure sealant materials: Wear resistance of flowable composite resins
Background. Wear resistance of pit and fissure sealant materials can influence their retention. Wear characteristics of sealant materials may determine scheduling of check-up visits. The aim of this study was to compare wear resistance of two flowable composite resins with that of posterior composite resin materials. Methods. Thirty-five disk-shaped specimens were prepared in 5 groups, includin...
متن کاملAn integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system
Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...
متن کاملdetection of volatile compounds of medicinal plants with some nano-sorbents using modified or new methodologies and investigation of antioxidant activity of their methanolic extracts
in this work, a novel and fast method for direct analysis of volatile compounds (davc) of medicinal plants has been developed by holding a filament from different parts of a plant in the gc injection port. the extraction and analysis of volatile components of a small amount of plant were carried out in one-step without any sample preparation. after optimization of temperature, extraction time a...
Preventive maintenance models with random maintenance quality
In real-world environments it is usually difficult to specify the quality of a preventive maintenance (PM) action precisely. This uncertainty makes it problematic to optimise maintenance policy. This problem is tackled in this paper by assuming that the quality of a PM action is a random variable following a probability distribution. Two frequently studied PM models, a failure rate PM model and...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Progress in Photovoltaics
سال: 2021
ISSN: ['1062-7995', '1099-159X']
DOI: https://doi.org/10.1002/pip.3492