This paper considers a variant of the relocation problem, which is formulated from an urban renewal project. There set jobs to be processed in two-machine flow shop subject given initial resource level. Each job consumes some units start its processing on machine 1 and will return amount when it completed 2. The released by not necessarily equal acquired for starting process. Subject constraint, problem find feasible schedule whose makespan minimum. In this paper, we first prove NP-hardness two special cases. Two heuristic algorithms with different characteristics, permutation non-permutation, are designed construct schedules. Ant colony optimization (ACO) also proposed produce approximate solutions. We design conduct computational experiments appraise performances algorithms.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Inverse scheduling: two-machine flow-shop problem

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

متن کامل

Two-Machine Flow-Shop Scheduling with Job Delivery Coordination

This study considers a class of two-machine flow-shop scheduling problems with job delivery coordination. Both vehicle capacity and transportation times are also investigated. The objective is to minimize the mean arrival time of jobs. Two integer programming models are developed to optimally solve this problem. These two integer programming models are Models 1 and 2. Model 1 adopts the concept...

متن کامل

Resource-constrained flowshop scheduling with separate resource recycling operations

This paper considers the relocation problem arising from public re-development projects cast as a two-machine flowshop scheduling problem. In such a project, some buildings need to be torn down and re-constructed. The two processes of tearing down and re-constructing each building are often viewed as a single operation. However, under certain circumstances, the re-construction process, i.e., th...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematics

سال: 2021

ISSN: ['2227-7390']

DOI: https://doi.org/10.3390/math9131527