RELIABILITY ENGINEERING OF LARGE JIT PRODUCTION SYSTEMS
نویسندگان
چکیده
منابع مشابه
Reliability Evaluation Of Engineering Systems
Title Type reliability evaluation of engineering systems PDF reliability evaluation of engineering systems billinton solutions PDF reliability evaluation of engineering systems solution manual PDF reliability evaluation of engineering systems solution problems PDF reliability evaluation of power systems billinton solution PDF control systems safety evaluation and reliability third edition isa r...
متن کاملModeling and Worker Motivation in JIT Production Systems
This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in lowand high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are the cause of idle time on the line. This means that processing time distributions are not independent o...
متن کاملMrp-jit Integrated Production System
A combined MRP(material requirement planning) and JIT(just in time) system can be more effective manufacturing system which utilizes the best attributes of each manufacturing system need to accommodate the best planning features of MRP and the best execution features of JIT to address the changing needs of industry. When MRP and JIT involve in any production system than its balance the all enti...
متن کاملReliability Evaluation of Failure Delayed Engineering Systems
This paper introduces an analytical approach for the evaluation of multi-user engineering systems presenting a failure delayed behaviour pattern, that is, systems whose performance decays progressively after the failures, due to internal fault tolerance mechanisms or to the complacency of the users regarding the temporarily unavailability of the services. The approach is based on the determinat...
متن کاملSimulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Reliability, Quality and Safety Engineering
سال: 2012
ISSN: 0218-5393,1793-6446
DOI: 10.1142/s0218539312500118