Reliability-Constrained Power System Expansion Planning: A Stochastic Risk-Averse Optimization Approach
نویسندگان
چکیده
This work presents a methodology to incorporate reliability constraints in the optimal power systems expansion planning problem. Besides Loss Of Load Probability (LOLP) and Expected Power Not Supplied (EPNS), traditionally used systems, this proposes use of risk measures VaR (Value-at-Risk) CVaR (Conditional Value-at-Risk), widely financial markets. The explicit consideration problem can be an extremely hard task and, minimize computational effort, applies Benders decomposition technique splitting into investment two subproblems evaluate system's operation cost index. subproblem is solved by Stochastic Dual Dynamic Programming (SDDP) Monte Carlo simulation. proposed applied real Bolivian system.
منابع مشابه
Partially Adaptive Stochastic Optimization for Electric Power Generation Expansion Planning
Electric Power Generation Expansion Planning (GEP) is the problem of determining an optimal construction and generation plan of both new and existing electric power plants to meet future electricity demand. We consider a stochastic optimization approach for this capacity expansion problem under demand and fuel price uncertainty. In a two-stage stochastic optimization model for GEP, the capacity...
متن کاملAlgorithms for Probabilistically-Constrained Models of Risk-Averse Stochastic Optimization with Black-Box Distributions
We consider various stochastic models that incorporate the notion of risk-averseness into the standard 2-stage recourse model, and develop novel techniques for solving the algorithmic problems arising in these models. A key notable feature of our work that distinguishes it from work in some other related models, such as the (standard) budget model and the (demand-) robust model, is that we obta...
متن کاملRisk-Averse Production Planning
We consider a production planning problem under uncertainty in which companies have to make product allocation decisions such that the risk of failing regulatory inspections of sites and consequently losing revenue is minimized. In the proposed decision model the regulatory authority is an adversary. The outcome of an inspection is a Bernoulli-distributed random variable whose parameter is a fu...
متن کاملData-Driven Risk-Averse Stochastic Optimization with Wasserstein Metric∗
The traditional two-stage stochastic programming approach is to minimize the total expected cost with the assumption that the distribution of the random parameters is known. However, in most practices, the actual distribution of the random parameters is not known, and instead, only a series of historical data are available. Thus, the solution obtained from the traditional twostage stochastic pr...
متن کاملA Probabilistic Approach to Transmission Expansion Planning in Deregulated Power Systems under Uncertainties
Restructuring of power system has faced this industry with numerous uncertainties. As a result, transmission expansion planning (TEP) like many other problems has become a very challenging problem in such systems. Due to these changes, various approaches have been proposed for TEP in the new environment. In this paper a new algorithm for TEP is presented. The method is based on probabilisti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Power Systems
سال: 2021
ISSN: ['0885-8950', '1558-0679']
DOI: https://doi.org/10.1109/tpwrs.2020.3007974