Relative Reliability Risk Assessment Applied to Original Designs During Conceptual Design Phase
نویسندگان
چکیده
منابع مشابه
Environmental risk assessment of a dam during construction phase
The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...
متن کاملMulti-objective optimization approach for cost management during product design at the conceptual phase
The effective cost management during the conceptual design phase of a product is essential to develop a product with minimum cost and desired quality. The integration of the methodologies of quality function deployment (QFD), value engineering (VE) and target costing (TC) could be applied to the continuous improvement of any product during product development. To optimize customer satisfaction ...
متن کاملAutomating Environmental Impact Assessment during the Conceptual Phase of Product Design
Product environmental impact reduction efforts largely focus on incremental changes during detailed design. Application of automated concept generation using a design repository and integral life cycle assessment approach is explored to evaluate and reduce environmental impacts in the conceptual phase of product design.
متن کاملSystem Risk Assessment and Allocation in Conceptual Design
................................................................................................................................v LIST OF TABLES................................................................................................................vi LIST OF FIGURES ...........................................................................................................vii Chapter
متن کاملWeyburn CO2 Miscible Flood Conceptual Design and Risk Assessment
For the three years leading up to the end of 1995, a multi-disciplinary project team evaluated the business opportunity of injecting carbon dioxide into a portion of the Weyburn Unit to improve recovery. As with any project of this magnitude, a comprehensive analysis of the opportunities and risks in the project had to be clearly defined and evaluated. A risk assessment using a Monte Carlo simu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
سال: 2006
ISSN: 0954-4054,2041-2975
DOI: 10.1243/09544054jem155