REGISTRATION OF A WORK PERMIT FOR WORKS AT HEIGHT
نویسندگان
چکیده
منابع مشابه
Producing and Introducing a Computer Software for Evaluating Performance of Permit to Work System in the Process Industries
Introduction: Permit-to-work system (PTW) system is a documented system to control the activities with inherent risks and probability of accident occurrence. To inform the performance and efficiency of a system, it must be periodically monitored and evaluated, and the permit to work system is no exception of this principle. The aim of the present study was to design and develop software for eva...
متن کاملA Technique for Registration and Reorientation of Surveyed Dental Casts
Precise registering and transferring of the selected path of insertion and withdrawal of removable, partial dentures is a critical step in designing and fabricating their framework and determining the retention, stability, and support of the completed prosthesis. Many authors have addressed this issue in their studies. In this study we present a new technique for registering and reproducing par...
متن کاملconditional copula-garch methods for value at risk of portfolio: the case of tehran stock exchange market
ارزش در معرض ریسک یکی از مهمترین معیارهای اندازه گیری ریسک در بنگاه های اقتصادی می باشد. برآورد دقیق ارزش در معرض ریسک موضوع بسیارمهمی می باشد و انحراف از آن می تواند موجب ورشکستگی و یا عدم تخصیص بهینه منابع یک بنگاه گردد. هدف اصلی این مطالعه بررسی کارایی روش copula-garch شرطی در برآورد ارزش در معرض ریسک پرتفویی متشکل از دو سهام می باشد و ارزش در معرض ریسک بدست آمده با روشهای سنتی برآورد ارزش د...
investigating the feasibility of a proposed model for geometric design of deployable arch structures
deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...
Development and validation of work permit system performance assessment questionnaire, a case study in an Iranian oil refinery
Background: Permit-to-work system is a process used to prevent accidents in the process industries. Evaluation and monitoring of the performance of a permit to work system reveal its inherent weaknesses and reduce accidents in process industries. Since there exists no local tool for monitoring the performance of permit-to-work system in refineries and process industries, such as petrochemicals,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Modern Technologies and Scientific and Technological Progress
سال: 2021
ISSN: 2686-9896
DOI: 10.36629/2686-9896-2021-1-1-270-271