Reduced-thickness CVN testing to represent slant failure of pipelines
نویسندگان
چکیده
منابع مشابه
Reduced Regional Brain Cortical Thickness in Patients with Heart Failure
AIMS Autonomic, cognitive, and neuropsychologic deficits appear in heart failure (HF) subjects, and these compromised functions depend on cerebral cortex integrity in addition to that of subcortical and brainstem sites. Impaired autoregulation, low cardiac output, sleep-disordered-breathing, hypertension, and diabetic conditions in HF offer considerable potential to affect cortical areas by los...
متن کاملRetractions Represent Failure
A retraction in science is the removal of a scientific paper from the literature’s records. Formerly and still on occasion today, retractions would involve the complete removal of all traces of the paper, including authors’ names, abstract and manuscript, what is now commonly termed a stealth or silent retraction. Despite what appears to be an increase in the number of retractions, retraction n...
متن کاملTesting of Buried Pipelines Using Guided Waves
Introduction The inspection requirements of pipes that have an operational history of many tens of years have lead to the adoption of new maintenance practices and safety standards. The solution currently considered as best maintenance practice is the direct assessment of 100% of the pipelines with the minimum possible economical impact. The use of RBI (Risk Based Inspection) methods and the in...
متن کاملReduced sensitivity of staphylococcus aureus to vancomycin
Introduction: Staphylococcus aureus is one of the most common causes of infections in hospitals and vancomycin is used for the treatment of methicillin resistant S, aureus infections. Therefore, imergence of Staphylococcus aureus with reduced sensitivity to vancomycin is a serious problem. The aim of this study was to investigate the prevalence of Staphylococcus aureus with reduced suscep...
متن کاملInvestigation of Pipelines' Failure Problem of Elshabab Pumping Stations
The east Delta horizontal expansion reclamation project is one of the Egyptian reclamation projects which was implemented in 1981. The project area is approximately equal to 366,500 Feddans. It's located in Ismalia Governorate at kilo 96.5 Cairo-Ismalia road. The irrigation system in this project depends on pumping stations at the right bank of Ismalia Canal through pipelines. The pipelines wer...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal Sustainable Construction & Design
سال: 2013
ISSN: 2032-7471
DOI: 10.21825/scad.v4i1.739