REASONS TO CHANGE THE TENDER PROJECT OF A TUNNEL DURING CONSTRUCTION
نویسندگان
چکیده
منابع مشابه
a synchronic and diachronic approach to the change route of address terms in the two recent centuries of persian language
terms of address as an important linguistics items provide valuable information about the interlocutors, their relationship and their circumstances. this study was done to investigate the change route of persian address terms in the two recent centuries including three historical periods of qajar, pahlavi and after the islamic revolution. data were extracted from a corpus consisting 24 novels w...
15 صفحه اولfrom linguistics to literature: a linguistic approach to the study of linguistic deviations in the turkish divan of shahriar
chapter i provides an overview of structural linguistics and touches upon the saussurean dichotomies with the final goal of exploring their relevance to the stylistic studies of literature. to provide evidence for the singificance of the study, chapter ii deals with the controversial issue of linguistics and literature, and presents opposing views which, at the same time, have been central to t...
15 صفحه اولa study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولconsequence analysis of the leakage, ignition and explosion during high pressure sour gas injection process to the oil reservoir
there is no doubt that human being needs to become integrated with industry and industry needs to be progressed, daily. on the other hand, serious events in industrial units specially in oil industries has been shown that such damages and events are industry related ones. the consequence of such events and damages which resulted in chemical and poisoned explosions and loss of life and property ...
Principles of Construction Cost Assessment During Preparation for Tender
Construction cost assessment during bid preparation is the most tedious and responsible stage. Evaluators have to take into account a multitude of various factors affecting construction cost. They include the following in case of the conventional construction pattern: the chosen methods and technologies of facility construction; options of construction provision with machinery and mechanisms, l...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Archives for Technical Sciences
سال: 2016
ISSN: 2233-0046,1840-4855
DOI: 10.7251/afts.2015.0713.043l