Real-time estimation of a multi-stage centrifugal compressor performance map considering real-gas processes and flexible operation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CFD Analysis of Off-design Centrifugal Compressor Operation and Performance

This paper presents some of the results from a Master’s thesis research into the performance and operation of a centrifugal compressor at off-design operating conditions using advanced computational fluid dynamics (CFD) techniques. ANSYS CFX is the CFD solver used in this blind study to evaluate the ability of modern CFD software to predict the performance of centrifugal compressors operating a...

متن کامل

Performance Measurements of a Full-stage Centrifugal Process Gas Compressor Test Rig

The paper presents the first experimental performance data for a mid-stage centrifugal compressor test rig built at RWTH Aachen University. The results provide an analysis of the operational and loss behavior and will be published in an open test case for validating numerical methods. The test rig was built to investigate the operational and loss behavior of a complete return channel in detail ...

متن کامل

Towards Real-time Neuronal Disparity Map Estimation

We propose in this paper a new approach for fast disparity map estimation from pair of stereo images. The disparity map computing is divided into two main steps. The first one deals with computing the initial disparity map using a neuronal DSI (Disparity Space Image) method. Whereas, the second one is a simple and fast method to refine the initial disparity map. New strategies and improvements ...

متن کامل

Real-time Scheduling of a Flexible Manufacturing System using a Two-phase Machine Learning Algorithm

The static and analytic scheduling approach is very difficult to follow and is not always applicable in real-time. Most of the scheduling algorithms are designed to be established in offline environment. However, we are challenged with three characteristics in real cases: First, problem data of jobs are not known in advance. Second, most of the shop’s parameters tend to be stochastic. Third, th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Process Control

سال: 2020

ISSN: 0959-1524

DOI: 10.1016/j.jprocont.2019.11.006