Reactive Scheduling Based Multi Objectives Negotiation for Dynamic Supply Chain Model
نویسندگان
چکیده
منابع مشابه
A Negotiation-Based Multi-Agent System for Supply Chain Management
This paper describes an ongoing effort in developing a Multiagent System (MAS) for supply chain management. In our framework, functional agents can join in, stay, or leave the system. The Supply Chain Management System (SCMS) functionality is implemented through agent-based negotiation. When an order arrives, a virtual supply chain may emerge from the system through automated or semi-automated ...
متن کاملNegotiation-based Collaboration Planning Model for Supply Chain Management
A collaboration planning model (CPM) for co-ordination of supply chain (SC) is established by the sharing of information, based on up and downstream planning models respectively. The factors under internal as well as external situations (price, inventory etc.) are considered in the model. The relationship of cooperating partnership is determined, and the goal of win-win is obtained by negotiati...
متن کاملMulti Agent System for Negotiation in Supply Chain Management Multi Agent System for Negotiation in Supply Chain Management
Supply chain management (SCM) is an emerging field that has commanded attention and support from the industrial community. Supply chain (SC) is defined as the chain linking each entity of the manufacturing and supply process from raw materials through to the end user. In order to increase supply chain effectiveness, minimize total cost, and reduce the bullwhip effect, integration and coordinati...
متن کاملHierarchical-Game Based Multi-Attribute Negotiation of Supply Chain Network
This paper focuses on hierarchical-game based multi-attribute negotiation between multiple MAs (Manufacture Agents) and multiple MSAs (Material Supplier Agents) of SCN (Supply Chain Network). The attributes of the wholesale price of the product, the quantity of the order and the lead time of the order are negotiated simultaneously. A modified hierarchical-game based negotiation protocol is prop...
متن کاملan inventory–scheduling model for supply chain of construction project
one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of International Conference on Leading Edge Manufacturing in 21st century : LEM21
سال: 2007
ISSN: 2424-3086
DOI: 10.1299/jsmelem.2007.4.8f621